Bar River road, Ford road and Government road have been prepped for single surface treatment. Also the process of filling in potholes and shoulder drop offs are being carried out.
The Bar River culvert has been replaced.
July saw three new recruits start their training with the Echo Bay Fire dept.
Local water treatment plant has given itself a clean bill of health after recent issues affecting local water supply.
Recent break-ins along the Highway 17B corridor are being looked at by council.