• Bar River road, Ford road and Government road have been prepped for single surface treatment. Also the process of filling in potholes and shoulder drop offs are being carried out.
  • The Bar River culvert has been replaced.
  • July saw three new recruits start their training with the Echo Bay Fire dept.
  • Local water treatment plant has given itself a clean bill of health after recent issues affecting local water supply.
  • Recent break-ins along the Highway 17B corridor are being looked at by council.